Plans for Proposed New Memorial Hall
This page gives access to the Plans and the Design &
Access statement for the proposed new Memorial Hall
buildings on the existing site. They were
submitted to the Peak District National Park Authority's
Planning Service, who registered their receipt on 2nd
July 2008 (ref. NP/DDD/0608/0546). Amended plans
were submitted on the 1st August, and the
Planning Committee
passed the application with conditions on the 15th
August 2008.
The information
is in pdf format, so you will need a reader programme.
If you do not have the current version of Adobe Acrobat
Reader you can download it free of charge by clicking
here:

Click
here to get Adobe Acrobat Reader
click on the
links or images below to see the plans
(some of the larger files may take a while to download)
|
Existing Site

This sheet gives the plan of the current
building and site. |
|
Proposed New Site Layout

This sheet gives the proposed redeveloped
layout indicating in block plan the new
buildings. |
|
Proposed New Memorial Hall Plan

Click here for updated
version (30/7/08)
This sheet gives the ground plan of the
proposed new Memorial Hall. To
understand this fully it should be seen in
conjunction with the Design & Access
Statement below. Also the various
spaces in the building have been
designed for flexible use, and further plans
indicating how this will work can be seen on
page 13 of the Design & Access Statement. |
|
Elevations of Proposed New Memorial Hall

Click here for updated
version (30/7/08)
These two sheets give drawings of the main
elevations. For more information and
drawings about
how the proposed new building will appear
and relate to the surrounding buildings see
pages 5, 8 and 14-17 of the Design & Access
Statement below. Also see the
modifications made after submission of the
planning application under the Supplementary
Design Statement (30/7/08) below. |
|
Full Design & Access Statement
This gives a comprehensive account of the
rationale for the proposed new building, how
it will work and how it will relate to the
site, to the road and footpaths and to the
surrounding buildings. To fully
understand the plans it is important to also
read this document. |
|
Supplementary Design
Statement

This Supplement (30th July 2008) gives
additional information and modifications to
some of the elevations, resulting from
discussions internally and with the Peak
Park Planners following submission of the
planning application. See also:
Appendix IV Revised Application Drawings
Appendix V Sustainability/Feasibility Study
|
|
Proposed New Electricity Substation

It is proposed to relocate the electricity
substation to enable more efficient use of
the site creating an enclosed rear
garden/play area and to create larger more
flexible community hall facilities.
The new substation would be sited in an
enlarged shed on Main Street (the
Carbide Shed). See also
Electricity Substation Proposal
|
When the
formal letter of planning consent is available we
will provide more details of the conditions that
include to:
-
Adopt amended plans
-
Minor design details
(including the already
intended re-use of
materials for the
Electricity sub-station
shed)
-
Include
agreed measures to
minimise the building's
carbon footprint
-
Comply with District
Council requirements
-
Comply with Highway
Authority requirements
-
Submission of
landscaping scheme
-
Restricted use of the
land adjacent to Shaw
Lane House
-
Restrict hours of
operation between 6-30am
and 12pm
-
Building only to be used
for local community
purposes within Class D2
|